He additional that Period two would include the stretch from the Lekki 2nd toll gate to your Ajah less than-bridge and will be divided into four sections.“Motorists from Ajah inward Lekki will likely be diverted to 1 lane although repairs are ongoing on one other lane,” Osiyemi said. “When the main lane is done, operate will transfer to the 2